The project

The experienced team from our London branch were involved in a major installation for GB Building Solutions, which included setting up an impressive triple stack of units.

The solution

Due to the need for the units to be triple stacked, brand new units were purchased with reinforced corner posts. The site was surveyed twice in advance of installation, where instruction was given to the client regarding the crane location; point loads of the cabins for foundation specification; and powered access due to triple stacking.

The qualified team at Mobile Mini unloaded the cabins from awaiting lorries to position them onto the elevated site location using a 80ft all terrain mobile crane, Scissor Lift and Cherry Picker to ensure a smooth and safe installation.

Full installation was complete within the one day, (despite hold ups on the M25 and A406) with the team working from 6am until 5.30pm.