Unilever

Project details

Unilever, Leatherhead

Our solution

This job involved repositioning two containers that had been delivered to site by a lorry loader which was unable to reach the location. There were three trees situated between the units and where the units needed to be.

This site was extremely complex due to the repositioning needed. The installation was carried out in Unilever’s car park and was scheduled for a Saturday to avoid any major disruptions. Both were lifted and positioned in very smoothly, and the whole job was completed within two hours.